Canadian owned & operated·XPEL certified installer·Toronto & the GTA
· Call Now
Home / Learning Hub / Security Glazing
Security Glazing4 min readNov 2026

ROCKGLASS Retrofit Panel or Replacement IGU?

Work through frame depth, fogged glass, display sightlines and installation timing.

Clear Guard
Clear Guard
November 22, 2026
Insulated glazing sample with visible spacer beside a framed clear panel
AI-generated illustration of commercial glazing samples.

Walk the storefront from inside before choosing a glazing system. If you like the existing windows and they are in good condition, a retrofit may let you keep them. If a sealed unit already needs replacement, this is the time to ask whether a hybrid security unit will fit.

What stays in a retrofit?

The existing glass stays in place. A separate framed ROCKGLASS panel sits over it. The new frame changes what you see at the perimeter, which matters when a restaurant has lettering on the glass or a display shelf runs right up to the window.

Ask the installer to identify the finished frame position and how each exposed surface will be cleaned. On an entrance door, include the closer, handles and adjacent fixed glass in the review. The manufacturer describes a vented retrofit frame and provides finish options. Manufacturer’s commercial installation overview

What changes with a hybrid IGU?

An insulated glass unit is the sealed assembly inside a window frame. A ROCKGLASS hybrid uses an exterior polycarbonate sheet, interior tempered glass and a spacer enclosing an argon-filled cavity. The existing glazed unit comes out. The surrounding frame can stay if it accommodates the complete replacement.

The 6 mm or 10 mm figure describes a sheet. The installer needs the overall thickness of the finished unit, including the other pane or panes and spacer. For a fogged window, ask for the existing seal condition and replacement dimensions to be checked before choosing the glass build-up.

Office glazing with a clipboard and unobstructed access to the windows

Compare daylight for the unit you will actually receive

The ClearSecure data sheet gives two examples with solar control, low-emissivity glazing and argon. Its dual-pane build with 10 mm solar-control ROCKGLASS and 6 mm tempered glass lists visible light transmission of 65%. The triple-pane example with an additional 6 mm tempered pane lists 50%. These numbers describe those exact builds. For a restaurant, ask to view a sample from a table and from the sidewalk under evening lights.

Read the elevation before approving fabrication

Ask for a simple marked photograph or elevation showing which panes will stay and which will come out. Give each a stable name such as “front display left when viewed from the street.” For each replacement, request the overall unit depth, the outside and inside materials, and the location of any coating or tint. For each retrofit, request the frame colour, finished sightline and the plan for reaching the original glazing if it later needs service.

On a restaurant frontage this also lets you assess the room from the guest’s seat. A change to one pane in a row might be more visible at night, when interior lighting reflects in the glass. Review the sample beside the existing windows before deciding whether a single replacement should match the neighbouring glass or whether an entire bay belongs in a later phase.

A mixed frontage can use both approaches

Imagine three adjoining shop windows. One sealed unit has a permanent haze between its panes. The other two are clear, and the tenant has recently paid for display graphics. Request a replacement option for the failed unit and separate retrofit options for the sound pair. Ask whether those graphics can remain legible, who will maintain them, and how they would be changed once a panel is installed.

Record on each quote line What it settles
Existing unit retained or removed Who handles disposal and when the storefront will be exposed during the work.
Finished depth and frame finish Whether the proposal fits the measured frame and meets the landlord’s appearance requirements.
Sample or specification reviewed Which tint, daylight performance and visible edge were actually agreed.
Handover and future access Who should be called if the original glass, graphics or seal later needs attention.

Plan the changeover

For a leased property, identify who can authorize altering the storefront. Agree on access during trading hours, who handles existing signs and when the entrance will be usable. ROCKGLASS recommends informing the local fire department where the product is installed so responders can plan for emergency access. Manufacturer’s emergency access notice

Ask for a written scope naming the window, the glass that stays or comes out, the panel thickness, the overall assembly and the installation work. Explore Clear Guard’s ROCKGLASS options.

Clear Guard
Clear Guard
Clear Guard

Clear Guard assesses storefront windows and doors for security glazing in Toronto and the GTA.

Security GlazingResearchGTA
More from the Learning Hub
Rigid transparent sample and rolled window film on a shop counter
Security Glazing

ROCKGLASS or Security Film for Your Storefront?

Choose between glass retention, a separate impact panel and a combination of both.

4 min · Nov 2026
Clear glazing samples and a dark framing section on a specification table
Security Glazing

10 mm ROCKGLASS vs. Riot Glass and DefenseLite

Compare ROCKGLASS with ArmorPlast AP375 and DefenseLite Pro using the actual panel and assembly specifications.

4 min · Nov 2026
Learning Hub · Updates

Get new research in your inbox.

One email per month. No spam.

Plan your storefront glazing.

Request a commercial quote